Environmental impact assessment of Minnesota Mining (Shanghai) acrylate pressure sensitive adhesive expansion project

environmental impact assessment of Minnesota Mining (Shanghai) acrylate pressure sensitive adhesive expansion project

July 8, 2011

[China paint information] release unit: Sinopec Shanghai Engineering Co., Ltd.

release date: July 7, 2011

1 The task comes from

Minnesota Mining Manufacturing special materials (Shanghai) Co., Ltd. is wholly-owned by 3M (China) Investment Co., Ltd. and the project is located in plot F4 of Shanghai chemical industry zone. At present, after the adjustment of Huangshan project phase I project, the annual output of solvent based resin is 7947 tons. Everyone should believe in Jinan's gold testing strength (including 6667 tons of solvent based acrylate pressure-sensitive adhesive and 1280 tons of artificial resin), 1499 tons of lotion resin (lotion based acrylate pressure-sensitive adhesive) and 601 tons of polyurethane. Because the current production capacity of solvent based acrylate pressure-sensitive adhesive can not meet the market demand, the company decided to expand the production line of this product and increase the annual output of 8070 tons

pressure sensitive adhesive refers to a kind of adhesive that can wet the bonded surface and stick the bonded object firmly with a certain pressure. Compared with other types of pressure-sensitive adhesives, acrylate pressure-sensitive adhesives have the following advantages: solvent resistance; Good anti-aging performance; It has good adhesion to various materials, such as plastic, paper, metal and ceramics; Most products are low toxic and can be directly used in food packaging and medical and health products

entrusted by Minnesota Mining Manufacturing special materials (Shanghai) Co., Ltd., Sinopec Shanghai Engineering Co., Ltd. carried out an environmental impact assessment on the "expansion project of Minnesota Mining Manufacturing special materials (Shanghai) Co., Ltd. with an annual output of 8070 tons of solvent based acrylate pressure sensitive adhesive". The first information release is now made to the public in accordance with the relevant national and municipal environmental protection laws and regulations

Minnesota Mining Manufacturing special materials (Shanghai) Co., Ltd. (the construction unit) and Sinopec Shanghai Engineering Co., Ltd. (the evaluation agency) are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, the relevant information will be gradually improved or adjusted

2. Project overview

2.1 project name

Minnesota Mining Manufacturing special materials (Shanghai) Co., Ltd. 8070 tons of solvent based acrylate pressure sensitive adhesive expansion project

2.2 construction site

plot F4 of Shanghai Chemical Industry Zone, in Minnesota Mining Manufacturing special materials (Shanghai) Co., Ltd

2.3 construction content

this project includes two 6000 gallon solvent based acrylic glue production lines, a 250 gallon solvent based acrylic glue production line, and product loading stations. The construction of this project will arrange the loading station according to the existing general plan, and arrange these three sets of production systems in the existing production workshop. The loading station will be arranged in the loading and unloading area between the storage tank area and the warehouse

2.4 industry

c266 special chemical product manufacturing

3. Name and contact information of the construction unit

construction unit: Minnesota Mining Manufacturing special materials (Shanghai) Co., Ltd.

contact address: No. 88, Muhua Road, Shanghai Chemical Industry Zone

contact: Miss Liu

contact:

4 Name and contact information of the evaluation organization

evaluation organization: Sinopec Shanghai Engineering Co., Ltd.

certificate number: National Environmental Assessment simultaneous standard summary safety belt coil spring fatigue life requirements stable to more than 50000 times, Zheng Jia Zi No. 1814

contact address: Galaxy Building, No. 769 Zhangyang Road, Pudong New Area, Shanghai

contact: Mr. Chen

contact:

5 Environmental impact assessment procedures and main work contents

main procedures of environmental impact assessment: on the basis of verifying engineering data and determining the pollution source of the project, combined with the environmental status of the construction area and environmental protection objectives, analyze the degree and scope of environmental impact of the project, take optical microscope to inspect the precipitates and grain size in the alloy before and after heat treatment, and evaluate the feasibility of project construction; Put forward requirements and suggestions for environmental protection measures in combination with national environmental protection policies and regulations, public opinions and environmental impact analysis results

main work contents of environmental impact assessment: including local environmental quality status investigation, pollution source investigation, original project review and environmental protection problems, engineering analysis, cleaner production analysis, environmental impact prediction and evaluation, environmental risk assessment, pollution prevention and control countermeasure analysis, public participation, environmental management and monitoring plan, planning compatibility analysis, total amount control and other contents. The purpose is to understand the project sewage discharge and environmental status, Predict the impact of the project on the surrounding environment after completion, and put forward corresponding environmental protection measures

6. Main matters for soliciting public opinions

this publicity mainly solicits the public's views on the environmental quality of the project location and surrounding areas, their understanding of the main environmental problems existing in the current region, their focus on the possible environmental problems during the construction process of the project and after completion and operation, and their opinions and suggestions on the environmental protection work of the project

7. Main ways for the public to put forward their opinions

after this information publicity, the public can express their opinions and opinions on the project construction and environmental assessment to the designated address by letter, etc

during the preparation of the environmental impact statement of the project, the public will be further solicited by means of the second publicity and the issuance of questionnaires. During this period, the public can still express their opinions and opinions

please try to provide correct and reliable contact information while expressing their opinions, so as to feed back relevant information of the project in time

8. The valid period of information release is within 10 days from the date of information release